N6 Galway City Ring Road

RFI Volume 3 – A.2.1 Route Selection Report (RSR)

 
Home Further Information Volume 1 Volume 2 Volume 3 Volume 4

 

RSR Executive Summary

RSR Volume 1 – Report

Route Selection Report - Part 1

Route Selection Report - Part 2

 

RSR Volume 2

Volume 2 Figures Table of Contents Table of Contents 
3.2.6

AADT Locations Red Option

3.2.7

AADT Locations Orange Option

3.2.8

AADT Locations Yellow Option

3.2.9

AADT Locations Blue Option

3.2.10

AADT Locations Pink Option

3.2.11

AADT Locations Green Option

4.1 Overall Key Plan - Constraints Study Area
4.3.1 Designated Sites for Nature Conservation (1 of 2)
4.3.2 Designated Sites for Nature Conservation (2 of 2)
4.3.3 Ecological Habitat Survey Site Locations
4.3.4 Rare and/or Protected Plant Species Locations
4.3.5 Annex I Habitat Map (1 of 2)
4.3.6 Annex I Habitat Map (2 of 2)
4.3.7 Habitat Map (1 of 2)
4.3.8 Habitat Map (2 of 2)
4.3.9 Ecological Importance of Habitat (1 of 2)
4.3.10 Ecological Importance of Habitat (2 of 2)
4.3.11 Bat Survey Site Locations
4.3.12 Lesser Horseshoe Bat Survey Results 
4.3.13 Daubenton's Bat & Leisler’s Bat Survey Results 
4.3.14 Whiskered Bat & Natter's Bat Survey Results 
4.3.15 Common Pipistrelle & Soprano Pipistrelle Bat Survey Results 
4.3.16 Nathusius’s Pipistrelle, Unidentified Myotis Species and Brown Long-eared Bat Survey Results 
4.3.17 Otter Survey Study Area & Results 
4.3.18 White - clawed Crayfish Survey Site Locations
4.3.19 Molluscan Survey Site Locations
4.3.20 Marsh Fritillary Survey Site Locations and Results
4.3.21 Red Grouse Survey Site Locations and Survey Results
4.3.22 Barn Owl Survey Results and Raptor Records
4.3.23 Wintering Bird Survey Sites 
4.4.1 Soils and Geology Unique Constraints Sheet 1 of 2
4.4.2 Soils and Geology Unique Constraints Sheet 2 of 2
4.4.3 Soils and Geology Constraints - Solid Geology
4.4.4

Soils and Geology Constraints - Soils Map

4.4.5 Soils and Geology Constraints - Subsoils
4.4.6 Soils and Geology Constraints - Soft Compressible Ground
4.4.7 Soils and Geology Constraints - Karst Features Sheet 1 of 2 
4.4.8 Soils and Geology Constraints - Karst Features Sheet 2 of 2 
4.4.9 Soils and Geology Constraints - Quarries and Mineral Resources
4.4.10 Soils and Geology Constraints - Licenced Industrial Facilities
4.4.11 Soils and Geology Constraints - Geological Heritage
4.5.1 Hydrogeology Constraints Overall Mapping - Sheet 1 of 2
4.5.2 Hydrogeology Constraints Overall Mapping - Sheet 2 of 2
4.5.3 Hydrogeology Constraints - Aquifer Classification
4.5.4

Hydrogeology Constraints - Aquifer Vulnerability

4.5.5 Hydrogeology Constraints - Hydroecological Sites (Sheet 1 of 2)
4.5.6 Hydrogeology Constraints - Hydroecological Sites (Sheet 2 of 2)
4.5.7  Hydrogeology Constraints - Abstraction Supply Wells
4.6.1  Hydrology Constraints - Drainage Catchments/Sub-catchments
4.6.2  Hydrology Constraints - Flood Risk Mapping - Pluvial & Groundwater
4.6.3 Hydrology Constraints - Flood Risk Mapping - Fluvial & Coastal
4.7.1 & 4.7.2 Landscape and Visual Constraints Sheets 1 & 2
4.9.1 Land Use & Planning Constraints 
4.9.2 Land Use & Planning Constraints Proposed Developments 1 of 2
4.9.3  Land Use & Planning Constraints Proposed Developments 2 of 2
4.9.4  Land Use & Planning Constraints Planning Applications
4.9.5  Land Use & Planning Constraints - Future Cycling/Pedestrian Networks
4.10.1  Engineering Constraints - Existing Infrastructure
4.10.2  Engineering Constraints - Bus Networks
4.11.1 - 4.11.6 Archaeological, Architectural and Cultural Heritage Constraints 1 to 6
4.12.1 Material Assets - Agricultural Constraints
4.13.1 Material Assets Non-Agricultural Constraints 
4.13.2.1 & 4.13.2.2 Material Assets Non-Agricultural - Existing Drainage Networks & Public Watermains 1 to 2 
4.13.3.1 & 4.13.3.2 Material Assets Non-Agricultural - Existing Utility Networks: Bord Gáis, ESB, SSE 1 to 2
4.13.4.1 & 4.13.4.2 Material Assets Non-Agricultural - Existing Utility Networks - UPC, E-Net, Eircom, BT, Three. 1 to 2
4.13.5 Waste Facility Constraints
4.15.1 Noise & Vibration and Air Quality & Climate Constraints
‌‌ 4.15.2 Galway City Council Lden Noise Map (2013 to 2018)
4.15.3 Galway City Council Lnight Noise Plan (2013 to 2018)
4.16.1 Human Beings Constraints
5.3.1.1 - 5.3.1.3

1st Environmental Workshop Record Sheets 1 to 3

5.3.2 Option Development Zones
5.3.3 2006 Galway City Outer Bypass with Habitat Mapping
5.3.4 Cyan Route Option with Habitat Mapping
5.3.4.1 - 5.3.4.3 2nd Environmental Workshop Record Sheets 1 to 3
5.3.5.1 - 5.3.5.3 3rd Environmental Workshop Record Sheets 1 to 3
6.1.1 Stage 1 Route Options Plan Layout
6.1.2  Stage 1 Route Options Schematic
6.3.1.0  Online Route Option: RED Mainline Plan/Profile Key Plan
6.3.1.1  Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 1 of 9
6.3.1.2  Online Route Option: RED Mainline CH 1+650 to CH 3+300 Sheet 2 of 9
6.3.1.3 Online Route Option: RED Mainline CH 3+300 to CH 4+950 Sheet 3 of 9
6.3.1.4 Online Route Option: RED Mainline CH 4+950 to CH 6+660 Sheet 4 of 9
6.3.1.5 Online Route Option: RED Mainline CH 6+600 to CH 8+200 Sheet 5 of 9
6.3.1.6 Online Route Option: RED Mainline CH 8+200 to CH 9+850 Sheet 6 of 9
6.3.1.7 Online Route Option: RED Mainline CH 9+850 to CH 11+600 Sheet 7 of 9
6.3.1.8 Online Route Option: RED Mainline CH 11+600 to CH 13+300 Sheet 8 of 9
6.3.1.9 Online Route Option: RED Mainline CH 13+300 to CH 15+058 Sheet 9 of 9
6.3.2.0  Stage 1 Orange Route Option - Mainline Plan/Profile Keyplan
6.3.2.1  Stage 1 Orange Route Option - Mainline Plan/Profile Sheet 1 of 9
6.3.2.2  Stage 1 Orange Route Option - Mainline Plan/Profile Sheet 2 of 9
6.3.2.3 Stage 1 Orange Route Option - Mainline Plan/Profile Sheet 3 of 9
6.3.2.4  Stage 1 Orange Route Option - Mainline Plan/Profile Sheet 4 of 9
6.3.2.5  Stage 1 Orange Route Option - Mainline Plan/Profile Sheet 5 of 9
6.3.2.6  Stage 1 Orange Route Option - Mainline Plan/Profile Sheet 6 of 9
6.3.3.7  Stage 1 Orange Route Option - Mainline Plan/Profile Sheet 7 of 9
6.3.2.8  Stage 1 Orange Route Option - Mainline Plan/Profile Sheet 8 of 9
6.3.2.9  Stage 1 Orange Route Option - Mainline Plan/Profile Sheet 9 of 9
6.3.3.0  Stage 1 Yellow Route Option - Mainline Plan/Profile Keyplan
6.3.3.1  Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 1 of 11
6.3.3.2 Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 2 of 11
6.3.3.3  Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 3 of 11
6.3.3.4  Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 4 of 11
6.3.3.5  Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 5 of 11
6.3.3.6  Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 6 of 11
6.3.3.7  Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 7 of 11
6.3.3.8  Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 8 of 11
6.3.3.9  Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 9 of 11
6.3.3.10  Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 10 of 11
6.3.3.11  Stage 1 Yellow Route Option - Mainline Plan/Profile Sheet 11 of 11
6.3.4.0 Stage 1 Blue Route Option - Mainline Plan/Profile Keyplan 
6.3.4.1  Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 1 of 10
6.3.4.2  Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 2 of 10
6.3.4.3  Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 3 of 10
6.3.4.4  Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 4 of 10
6.3.4.5  Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 5 of 10
6.3.4.6  Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 6 of 10
6.3.4.7  Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 7 of 10
6.3.4.8  Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 8 of 10
6.3.4.9  Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 9 of 10
6.3.4.10  Stage 1 Blue Route Option - Mainline Plan/Profile Sheet 10 of 10
6.3.5.0  Stage 1 Pink Route Option - Mainline Plan/Profile Keyplan
6.3.5.1  Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 1 of 10
6.3.5.2  Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 2 of 10
6.3.5.3  Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 3 of 10
6.3.5.4  Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 4 of 10
6.3.5.5  Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 5 of 10
6.3.5.6  Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 6 of 10
6.3.5.7  Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 7 of 10
6.3.5.8  Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 8 of 10
6.3.5.9  Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 9 of 10
6.3.5.10  Stage 1 Pink Route Option - Mainline Plan/Profile Sheet 10 of 10
6.3.6.0  Stage 1 Green Route Option - Mainline Plan/Profile Keyplan
6.3.6.1  Stage 1 Green Route Option - Mainline Plan/Profile Sheet 1 of 13
6.3.6.2  Stage 1 Green Route Option - Mainline Plan/Profile Sheet 2 of 13
6.3.6.3  Stage 1 Green Route Option - Mainline Plan/Profile Sheet 3 of 13
6.3.6.4  Stage 1 Green Route Option - Mainline Plan/Profile Sheet 4 of 13
6.3.6.5  Stage 1 Green Route Option - Mainline Plan/Profile Sheet 5 of 13
6.3.6.6  Stage 1 Green Route Option - Mainline Plan/Profile Sheet 6 of 13
6.3.6.7  Stage 1 Green Route Option - Mainline Plan/Profile Sheet 7 of 13
6.3.6.8  Stage 1 Green Route Option - Mainline Plan/Profile Sheet 8 of 13
6.3.6.9  Stage 1 Green Route Option - Mainline Plan/Profile Sheet 9 of 13
6.3.6.10  Stage 1 Green Route Option - Mainline Plan/Profile Sheet 10 of 13
6.3.6.11  Stage 1 Green Route Option - Mainline Plan/Profile Sheet 11 of 13
6.3.6.12  Stage 1 Green Route Option - Mainline Plan/Profile Sheet 12 of 13
6.3.6.13  Stage 1 Green Route Option - Mainline Plan/Profile Sheet 13 of 13
6.5.5.1  Stage 1 Route Options and Annex I Habitats Sheet 1 of 8
6.5.1.2  Stage 1 Route Options and Annex I Habitats Sheet 2 of 8
6.5.1.3  Stage 1 Route Options and Annex I Habitats Sheet 3 of 8
6.5.1.4 Stage 1 Route Options and Annex I Habitats Sheet 4 of 8
6.5.1.5  Stage 1 Route Options and Annex I Habitats Sheet 5 of 8
6.5.1.6  Stage 1 Route Options and Annex I Habitats Sheet 6 of 8
6.5.1.7  Stage 1 Route Options and Annex I Habitats Sheet 7 of 8
6.5.1.8  Stage 1 Route Options and Annex I Habitats Sheet 8 of 8
6.5.1.9  Stage 1 Route Options and Bat Survey Results Sheet 1 of 4
6.5.1.10  Stage 1 Route Options and Bat Survey Results Sheet 2 of 4
6.5.1.11  Stage 1 Route Options and Bat Survey Results Sheet 3 of 4
6.5.1.12  Stage 1 Route Options and Bat Survey Results Sheet 4 of 4
6.5.1.13  Stage 1 Route Options with Protected Flora and Fauna Species Sheet 1 of 4
6.5.1.14  Stage 1 Route Options with Protected Flora and Fauna Species Sheet 2 of 4
6.5.1.15  Stage 1 Route Options with Protected Flora and Fauna Species Sheet 3 of 4
6.5.1.16  Stage 1 Route Options with Protected Flora and Fauna Species Sheet 4 of 4
6.5.1.17  Stage 1 Route Options and Annex I Habitats at Lough Corrib cSAC Crossing Sheet 1 of 2 
6.5.1.18  Stage 1 Route Options and Annex I Habitats at Lough Corrib cSAC Crossing Sheet 2 of 2 
6.5.1.19  Stage 1 Route Options with Wintering Bird Survey Sites Sheet 1 of 2
6.5.1.20  Stage 1 Route Options with Wintering Bird Survey Sites Sheet 2 of 2
6.5.2.1  Stage 1 Route Options with Soils & Geology Unique Constraints Sheet 1 of 2
6.5.2.2  Stage 1 Route Options with Soils & Geology Unique Constraints Sheet 2 of 2
6.5.2.3  Stage 1 Route Options with Solid Geology Sheet 1 of 2
6.5.2.4 Stage 1 Route Options with Solid Geology Sheet 2 of 2
6.5.2.5  Stage 1 Route Options with Soils Mapping Sheet 1 of 2
6.5.2.6  Stage 1 Route Options with Soils Mapping Sheet 2 of 2
6.5.2.7  Stage 1 Route Options with Subsoils Mapping Sheet 1 of 2
6.5.2.8  Stage 1 Route Options with Subsoils Mapping Sheet 2 of 2
6.5.2.9  Stage 1 Route Options with Soft Compressible Ground Sheet 1 of 2
6.5.2.10  Stage 1 Route Options with Soft Compressible Ground Sheet 2 of 2
6.5.2.11  Stage 1 Route Options with Principal Cuttings & Embankments Sheet 1 of 2
6.5.2.12  Stage 1 Route Options with Principal Cuttings & Embankments Sheet 2 of 2
6.5.3.1  Stage 1 Route Options with Hydrogeology Constraints Sheet 1 of 2
6.5.3.2  Stage 1 Route Options with Hydrogeology Constraints Sheet 2 of 2
6.5.4.1  Stage 1 Route Options with Hydrology Constraints – Drainage Catchments Sheet 1 of 2
6.5.4.2  Stage 1 Route Options with Hydrology Constraints – Drainage Catchments Sheet 2 of 2
6.5.4.3  Stage 1 Route Options with Flood Risk Mapping Pluvial & Groundwater Sheet 1 of 2
6.5.4.4  Stage 1 Route Options with Flood Risk Mapping Pluvial & Groundwater Sheet
6.5.4.5  Stage 1 Route Options with Flood Risk Mapping Fluvial & Coastal Sheet 1 of 2
6.5.4.6  Stage 1 Route Options with Flood Risk Mapping Fluvial & Coastal Sheet 2 of 2
6.5.5.1  Stage 1 Red Route Option with Landscape and Visual Assessment
6.5.5.2  Stage 1 Red Route Option with Landscape and Visual Assessment Sheet 2 of 2
6.5.5.3  Stage 1 Orange Route Option with Landscape and Visual Assessment Sheet 1 of 2
6.5.5.4  Stage 1 Orange Route Option with Landscape and Visual Assessment Sheet 2 of 2
6.5.5.5  Stage 1 Yellow Route Option with Landscape and Visual Assessment Sheet 1 of 2
6.5.5.6  Stage 1 Yellow Route Option with Landscape and Visual Assessment Sheet 2 of 2
6.5.5.7  Stage 1 Blue Route Option with Landscape and Visual Assessment Sheet 1 of 2
6.5.5.8  Stage 1 Blue Route Option with Landscape and Visual Assessment Sheet 2 of 2
6.5.5.9  Stage 1 Pink Route Option with Landscape and Visual Assessment Sheet 1 of 2
6.5.5.10  Stage 1 Pink Route Option with Landscape and Visual Assessment Sheet 2 of 2
6.5.5.11  Stage 1 Green Route Option with Landscape and Visual Assessment Sheet 1 of 2
6.5.5.12  Stage 1 Green Route Option with Landscape and Visual Assessment Sheet 2 of 2
6.5.6.1  Stage 1 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 1 of 6
6.5.6.2  Stage 1 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 2 of 6
6.5.6.3  Stage 1 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 3 of 6
6.5.6.4  Stage 1 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 4 of 6
6.5.6.5  Stage 1 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 5 of 6
6.5.6.6  Stage 1 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 6 of 6
6.5.7.1  Stage 1 Route Options with Material Assets - Agriculture Constraints Sheet 1 of 2
6.5.7.2  Stage 1 Route Options with Material Assets - Agriculture Constraints Sheet 2 of 2
 Red 1 Route Option with Material Assets Non-Agricultural Properties Sheet 1 of 2
6.5.8.2  Red 1 Route Option with Material Assets Non-Agricultural Properties Sheet 2 of 2
6.5.8.3  Orange 1 Route Option with Material Assets Non-Agricultural Properties Sheet 1 of 2
6.5.8.4  Orange 1 Route Option with Material Assets Non-Agricultural Properties Sheet 2 of 2
6.5.8.5  Yellow 1 Route Option with Material Assets Non-Agricultural Properties Sheet 1 of 2
6.5.8.6  Yellow 1 Route Option with Material Assets Non-Agricultural Properties Sheet 12of 2
6.5.8.7  Blue 1 Route Option with Material Assets Non-Agricultural Properties Sheet 1 of 2
6.5.8.8  Blue 1 Route Option with Material Assets Non-Agricultural Properties Sheet 2 of 2
6.5.8.9  Pink 1 Route Option with Material Assets Non-Agricultural Properties Sheet 1 of 2
6.5.8.10  Pink 1 Route Option with Material Assets Non-Agricultural Properties Sheet 2 of 2
6.5.8.11  Green 1 Route Option with Material Assets Non-Agricultural Properties Sheet 1 of 2
6.5.8.12  Green 1 Route Option with Material Assets Non-Agricultural Properties Sheet 2 of 2
6.5.8.13  Stage 1 Route Options with Bord Gáis, HV ESB, SSE Constraints Sheet 1 of 2
6.5.8.14  Stage 1 Route Options with Bord Gáis, HV ESB, SSE Constraints Sheet 2 of 2
6.5.9.1  Stage 1 Route Options with Air Assessment Sheet 1 of 2
6.5.9.2  Stage 1 Route Options with Air Assessment Sheet 2 of 2
6.5.10.1  Stage 1 Route Options with Noise Constraints Sheet 1 of 2
6.5.10.2  Stage 1 Route Options with Noise Constraints Sheet 2 of 2
6.5.11.1  Stage 1 Route Options with Human Beings Constraints Sheet 1 of 2
6.5.11.2  Stage 1 Route Options with Human Beings Constraints Sheet 2 of 2
7.1.1  Stage 2 Route Options Plan Layout
7.1.2  Stage 2 Route Options - Schematic
7.1.3  Stage 2 Route Options Blue-Green Switch
7.2.1.1 - 7.2.1.3  4th Environmental Workshop Display Sheets 1 to 3
7.2.2  Stage 2 Blue Route Option - N6 Junction
7.2.3  Stage 2 Pink Route Option - N6 Junction
7.2.4  Stage 2 Green Route Option - N6 Junction
7.2.5  Stage 2 Red – Orange - Yellow Route Option - N6 Junction
7.2.8.1  AADT Locations - Red Option
7.2.8.2  AADT Locations - Orange Option
7.2.8.3  AADT Locations - Yellow Option
7.2.8.4  AADT Locations - Blue Option
7.2.8.5  AADT Locations - Pink Option
7.2.8.6  AADT Locations - Green Option
7.3.1.0  Online Route Option: RED Mainline Plan/Profile Key Plan
7.3.1.1  Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 1 of 9
7.3.1.2  Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 2 of 9
7.3.1.3  Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 3 of 9
7.3.1.4  Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 4 of 9
7.3.1.5  Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 5 of 9
7.3.1.6  Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 6 of 9
7.3.1.7  Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 7 of 9
7.3.1.8  Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 8 of 9
7.3.1.9  Online Route Option: RED Mainline CH 0+000 to CH 1+650 Sheet 9 of 9
7.3.2.0 Stage 2 Orange Route Option - Mainline Plan/Profile Keyplan
7.3.2.1 Stage 2 Orange Route Option - Mainline Plan/Profile Sheet 1 of 9
7.3.2.2 Stage 2 Orange Route Option - Mainline Plan/Profile Sheet 2 of 9
7.3.2.3 Stage 2 Orange Route Option - Mainline Plan/Profile Sheet 3 of 9
7.3.2.4 Stage 2 Orange Route Option - Mainline Plan/Profile Sheet 4 of 9 
7.3.2.5 Stage 2 Orange Route Option - Mainline Plan/Profile Sheet 5 of 9 
7.3.2.6 Stage 2 Orange Route Option - Mainline Plan/Profile Sheet 6 of 9 
7.3.2.7 Stage 2 Orange Route Option - Mainline Plan/Profile Sheet 7 of 9
7.3.2.8 Stage 2 Orange Route Option - Mainline Plan/Profile Sheet 8 of 9 
7.3.2.9 Stage 2 Orange Route Option - Mainline Plan/Profile Sheet 9 of 9  
7.3.3.0 Stage 2 Yellow Route Option - Mainline Plan/Profile Keyplan
7.3.3.1  Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 1 of 11
7.3.3.2 Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 2 of 11 
7.3.3.3 Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 3 of 11 
7.3.3.4 Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 4 of 11 
7.3.3.5 Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 5 of 11 
7.3.3.6 Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 6 of 11 
7.3.3.7  Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 7 of 11
7.3.3.8  Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 8 of 11
7.3.3.9  Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 9 of 11
7.3.3.10  Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 10 of 11
7.3.3.11  Stage 2 Yellow Route Option - Mainline Plan/Profile Sheet 11 of 11
7.3.4.0  Stage 2 Blue Route Option - Mainline Plan/Profile Keyplan
7.3.4.1  Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 1 of 10
7.3.4.2  Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 2 of 10
7.3.4.3  Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 3 of 10
7.3.4.4  Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 4 of 10
7.3.4.5  Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 5 of 10
7.3.4.6  Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 6 of 10
7.3.4.7 Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 7 of 10
7.3.4.8  Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 8 of 10
7.3.4.9  Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 9 of 10
7.3.4.10  Stage 2 Blue Route Option - Mainline Plan/Profile Sheet 10 of 10
7.3.5.0  Stage 2 Pink Route Option - Mainline Plan/Profile Keyplan
7.3.5.1  Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 1 of 10
7.3.5.2  Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 2 of 10
7.3.5.3  Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 3 of 10
7.3.5.4  Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 4 of 10
7.3.5.5  Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 5 of 10
7.3.5.6  Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 6 of 10
7.3.5.7  Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 7 of 10
7.3.5.8  Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 8 of 10
7.3.5.9  Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 9 of 10
7.3.5.10  Stage 2 Pink Route Option - Mainline Plan/Profile Sheet 10 of 10
7.3.6.0  Stage 2 Green Route Option - Mainline Plan/Profile Keyplan
7.3.6.1  Stage 2 Green Route Option - Mainline Plan/Profile Sheet 1 of 13
7.3.6.2  Stage 2 Green Route Option - Mainline Plan/Profile Sheet 2 of 13
7.3.6.3  Stage 2 Green Route Option - Mainline Plan/Profile Sheet 3 of 13
7.3.6.4  Stage 2 Green Route Option - Mainline Plan/Profile Sheet 4 of 13
7.3.6.5  Stage 2 Green Route Option - Mainline Plan/Profile Sheet 5 of 13
7.3.6.6  Stage 2 Green Route Option - Mainline Plan/Profile Sheet 6 of 13
7.3.6.7  Stage 2 Green Route Option - Mainline Plan/Profile Sheet 7 of 13
7.3.6.8  Stage 2 Green Route Option - Mainline Plan/Profile Sheet 8 of 13
7.3.6.9  Stage 2 Green Route Option - Mainline Plan/Profile Sheet 9 of 13
7.3.6.10  Stage 2 Green Route Option - Mainline Plan/Profile Sheet 10 of 13
7.3.6.11  Stage 2 Green Route Option - Mainline Plan/Profile Sheet 11 of 13
7.3.6.12  Stage 2 Green Route Option - Mainline Plan/Profile Sheet 12 of 13
7.3.6.13  Stage 2 Green Route Option - Mainline Plan/Profile Sheet 13 of 13
7.6.1.1  Stage 2 Route Options and Annex I Habitats Sheet 1 of 8
7.6.1.2  Stage 2 Route Options and Annex I Habitats Sheet 2 of 8
7.6.1.3 Stage 2 Route Options and Annex I Habitats Sheet 3 of 8 
7.6.1.4  Stage 2 Route Options and Annex I Habitats Sheet 4 of 8
7.6.1.5  Stage 2 Route Options and Annex I Habitats Sheet 5 of 8
7.6.1.6 Stage 2 Route Options and Annex I Habitats Sheet 6 of 8
7.6.1.7  Stage 2 Route Options and Annex I Habitats Sheet 7 of 8
7.6.1.8  Stage 2 Route Options and Annex I Habitats Sheet 8 of 8
7.6.1.9  Stage 2 Route Options and Bat Survey Results Sheet 1 of 4
7.6.1.10  Stage 2 Route Options and Bat Survey Results Sheet 2 of 4
7.6.1.11  Stage 2 Route Options and Bat Survey Results Sheet 3 of 4
7.6.1.12  Stage 2 Route Options and Bat Survey Results Sheet 4 of 4
7.6.1.13 Stage 2 Route Options and Other Species Sheet 1 of 4
7.6.1.14 Stage 2 Route Options and Other Species Sheet 2 of 4
7.6.1.15 Stage 2 Route Options and Other Species Sheet 3 of 4
7.6.1.16 Stage 2 Route Options and Other Species Sheet 4 of 4
7.6.1.17 Stage 2 Route Options and Annex I Habitats at Lough Corrib cSAC Crossing Sheet 1 of 2 
7.6.1.18 Stage 2 Route Options and Annex I Habitats at Lough Corrib cSAC Crossing Sheet 2 of 2 
7.6.1.19 Stage 2 Route Options with Wintering Bird Survey Sites Sheet 1 of 2 
7.6.1.20 Stage 2 Route Options with Wintering Bird Survey Sites Sheet 2 of 2 
7.6.2.1 Stage 2 Route Options with Soils & Geology Unique Constraints Sheet 1 of 2
7.6.2.2 Stage 2 Route Options with Soils & Geology Unique Constraints Sheet 2 of 2
7.6.2.3 Stage 2 Route Options with Solid Geology Sheet 1 of 2
7.6.2.4 Stage 2 Route Options with Solid Geology Sheet 2 of 2
7.6.2.5 Stage 2 Route Options with Soils Mapping Sheet 1 of 2
7.6.2.6 Stage 2 Route Options with Soils Mapping Sheet 2 of 2
7.6.2.7 Stage 2 Route Options with Subsoils Mapping Sheet 1 of 2
7.6.2.8 Stage 2 Route Options with Subsoils Mapping Sheet 2 of 2
7.6.2.9 Stage 2 Route Options with Soft Compressible Ground Sheet 1 of 2
7.6.2.10 Stage 2 Route Options with Soft Compressible Ground Sheet 2 of 2
7.6.2.11 Stage 2 Route Options with Principal Cuttings & Embankments Sheet 1 of 2
7.6.2.12 Stage 2 Route Options with Principal Cuttings & Embankments Sheet 2 of 2
7.6.3.1 Stage 2 Route Options with Hydrogeology Constraints Sheet 1 of 2
7.6.3.2 Stage 2 Route Options with Hydrogeology Constraints Sheet 2 of 2
7.6.4.1 Stage 2 Route Options with Hydrology Constraints - Drainage Catchments Sheet 1 of 2
7.6.4.2 Stage 2 Route Options with Hydrology Constraints - Drainage Catchments Sheet 2 of 2
7.6.4.3 Stage 2 Route Options with Flood Risk Mapping - Pluvial & Groundwater Sheet 1 of 2
7.6.4.4 Stage 2 Route Options with Flood Risk Mapping - Pluvial & Groundwater Sheet 2 of 2
7.6.4.5  Stage 2 Route Options with Flood Risk Mapping - Fluvial & Coastal Sheet 1 of 2
7.6.4.6  Stage 2 Route Options with Flood Risk Mapping - Fluvial & Coastal Sheet 2 of 2
7.6.5.1  Stage 2 Red Route Option with Landscape and Visual Assessment Sheet 1 of 2
7.6.5.2  Stage 2 Red Route Option with Landscape and Visual Assessment Sheet 2 of 2
7.6.5.3  Stage 2 Orange Route Option with Landscape and Visual Assessment Sheet 1 of 2
7.6.5.4  Stage 2 Orange Route Option with Landscape and Visual Assessment Sheet 2 of 2
7.6.5.5  Stage 2 Yellow Route Option with Landscape and Visual Assessment Sheet 1 of 2
7.6.5.6  Stage 2 Yellow Route Option with Landscape and Visual Assessment Sheet 2 of 2
7.6.5.7  Stage 2 Blue Route Option with Landscape and Visual Assessment Sheet 1 of 2
7.6.5.8  Stage 2 Blue Route Option with Landscape and Visual Assessment Sheet 2 of 2
7.6.5.9  Stage 2 Pink Route Option with Landscape and Visual Assessment Sheet 1 of 2
7.6.5.10  Stage 2 Pink Route Option with Landscape and Visual Assessment Sheet 2 of 2
7.6.5.11  Stage 2 Green Route Option with Landscape and Visual Assessment Sheet 1 of 2
7.6.5.12  Stage 2 Green Route Option with Landscape and Visual Assessment Sheet 2 of 2
7.6.6.1  Stage 2 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 1 of 6
7.6.6.2  Stage 2 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 2 of 6
7.6.6.3  Stage 2 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 3 of 6
7.6.6.4  Stage 2 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 4 of 6
7.6.6.5  Stage 2 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 5 of 6
7.6.6.6  Stage 2 Route Options with Archaeological, Architectural and Cultural Heritage Constraints Sheet 6 of 6
7.6.7.1  Stage 2 Route Options with Material Assets - Agriculture Constraints Sheet 1 of 2
7.6.7.2  Stage 2 Route Options with Material Assets - Agriculture Constraints Sheet 2 of 2
7.6.8.1  Red 2 Route Option with Material Assets Non-Agricultural Properties Sheet 1 of 2
7.6.8.2  Red 2 Route Option with Material Assets Non-Agricultural Properties Sheet 2 of 2
7.6.8.3  Orange 2 Route Option with Material Assets Non-Agricultural Properties Sheet 1 of 2
7.6.8.4  Orange 2 Route Option with Material Assets Non-Agricultural Properties Sheet 2 of 2
7.6.8.5  Yellow 2 Route Options with Material Assets Non-Agricultural Properties Sheet 1 of 2
7.6.8.6  Yellow 2 Route Options with Material Assets Non-Agricultural Properties Sheet 2 of 2
7.6.8.7  Blue 2 Route Options with Material Assets Non-Agricultural Properties Sheet 1 of 2
7.6.8.8  Blue 2 Route Options with Material Assets Non-Agricultural Properties Sheet 2 of 2
7.6.8.9  Pink 2 Route Options with Material Assets Non-Agricultural Properties Sheet 1 of 2
7.6.8.10  Pink 2 Route Options with Material Assets Non-Agricultural Properties Sheet 2 of 2
7.6.8.11  Green 2 Route Options with Material Assets Non-Agricultural Properties Sheet 1 of 2
7.6.8.12  Green 2 Route Options with Material Assets Non-Agricultural Properties Sheet 2 of 2
7.6.8.13  Stage 2 Route Options with Bord Gáis/ESB/SSE Constraints Sheet 1 of 2
7.6.8.14  Stage 2 Route Options with Bord Gáis/ESB/SSE Constraints Sheet 2 of 2
7.6.9.1  Stage 2 Route Options with Air Assessment Sheet 1 of 2
7.6.9.2  Stage 2 Route Options with Air Assessment Sheet 2 of 2
7.6.10.1  Noise Contour Maps Red Route Lden Noise Contour Plot
7.6.10.2  Noise Contour Maps Orange Route Lden Noise Contour Plot
7.6.10.3  Noise Contour Maps Yellow Route Lden Noise Contour Plot
7.6.10.4  Noise Contour Maps Blue Route Lden Noise Contour Plot
7.6.10.5  Noise Contour Maps Pink Route Lden Noise Contour Plot
7.6.10.6  Noise Contour Maps Green Route Lden Noise Contour Plot
7.6.11.1  Stage 2 Route Options with Human Beings Constraints Sheet 1 of 2
7.6.11.2  Stage 2 Route Options with Human Beings Constraints Sheet 2 of 2
7.6.12.1& 7.6.12.2  Stage 2 Route Options with Land Use Map Sheets 1 to 2
7.8.1  Emerging Preferred Route Corridor
7.8.2  Stage 2 Route Options with Preferred Route Option Plan Layout

 

RSR Volume 3 – Appendices

 

 

Volume 3A

Volume 3A - Appendix Part 1 Appendix Table of Contents
A.2.1

Phase 1 Preliminary Appraisal

A.3.1 Traffic Modelling Report – Appendices
A.3.1 A

Traffic Modelling Report

 

 

Volume 3B

Volume 3B - Appendix Table of Contents Appendix Table of Contents
A.4.1 Public Consultation No. 1
A.4.2 Ecological Constraints Report
A.4.2 Appendix A Ecological Constraints Report 
A.4.2 Appendix B Ecological Constraints Report 
A.4.2 Appendix C Ecological Constraints Report 
A.4.2 Appendix D Ecological Constraints Report 
A.4.2 Appendix E Ecological Constraints Report 
A.4.2 Appendix F Ecological Constraints Report 
A.4.2 Appendix G Ecological Constraints Report 
A.4.2 Appendix H Ecological Constraints Report 
A.4.2 Appendix I Ecological Constraints Report 
A.4.2 Appendix J Ecological Constraints Report 
A.4.2 Appendix K Ecological Constraints Report 
A.4.2 Appendix L_I2 Ecological Constraints Report 
A.4.2 Appendix M Ecological Constraints Report 
A.4.2 Appendix N Ecological Constraints Report 
A.4.3 Rahoon Ground Investigation
A.4.4 Karst Study Report
A.4.5 Archaeological Geophysics at Ballybrit

 

 

Volume 3C

Volume 3C - Appendix Part 3 Table of Contents Appendix 3 Table of Contents
A.5.1 Lough Corrib Route Options Report
A.5.2 Coastal Route Options Report
A.5.3 On-line Option Report
A.5.4 * N6 Galway City Outer Bypass (2006) Route Option Report
A.5.5 ** Cyan Route Option Report
A.6.1 Public Consultation No. 2
A.6.2 Road Safety Impact Assessment
A.6.3 Stage 1 Noise Assessment – Potential Impact Ratings (PIR)

 

 

 *Appendix A.5.4

Figure 1.1 2006 GCOB Route Option Plan Layout
Figure 3.2.1 2006 GCOB Route Option with Ecology Constraints Habitats - Sheet 1 of 2
Figure 3.2.2 2006 GCOB Route Option with Ecology Constraints Habitats - Sheet 2 of 2
Figure 3.2.3 2006 GCOB Route Option and Bat Survey Results - Sheet 1 of 2
Figure 3.2.4 2006 GCOB Route Option with and Bat Survey Results - Sheet 2 of 2
Figure 3.2.5

2006 GCOB Route Option with Protected Flora and Fauna Species - Sheet 1 of 2

Figure 3.2.6

2006 GCOB Route Option with Protected Flora and Fauna Species - Sheet 2 of 2

Figure 3.2.7

2006 GCOB Route Option with Annex I Habitats at Lough Corrib cSAC Crossing

Figure 3.3.1

2006 GCOB Route Option with Soils and Geology Unique Constraints - Sheet 1 of 2

Figure 3.3.2

2006 GCOB Route Option with Soils and Geology Unique Constraints - Sheet 2 of 2

Figure 3.3.3 2006 GCOB Route Option with Solid Geology - Sheet 1 of 2
Figure 3.3.4 2006 GCOB Route Option with Solid Geology - Sheet 2 of 2
Figure 3.3.5

2006 GCOB Route Option with Soils Mapping - Sheet 1 of 2

Figure 3.3.6 2006 GCOB Route Option with Soils Mapping - Sheet 2 of 2
Figure 3.3.7 2006 GCOB Route Option with Subsoils Mapping - Sheet 1 of 2
Figure 3.3.8 2006 GCOB Route Option with Subsoils Mapping - Sheet 2 of 2
Figure 3.3.9 2006 GCOB Route Option with Soft Compressible Ground - Sheet 1 of 2
Figure 3.3.10 2006 GCOB Route Option with Soft Compressible Ground - Sheet 2 of 2
Figure 3.3.11 2006 GCOB Route Option with Principal Cuttings and Embankments - Sheet 1 of 2
Figure 3.3.12 2006 GCOB Route Option with Principal Cuttings and Embankments - Sheet 2 of 2
Figure 3.4.1 2006 GCOB Route Option with Hydrogeology Constraints - Sheet 1 of 2
Figure 3.4.2

2006 GCOB Route Option with Hydrogeology Constraints - Sheet 2 of 2

Figure 3.5.1

2006 GCOB Route Option with Hydrology Constraints – Drainage Catchments - Sheet 1 of 2

Figure 3.5.2

2006 GCOB Route Option with Hydrology Constraints – Drainage Catchments - Sheet 2 of 2

Figure 3.5.3

2006 GCOB Route Option with Flood Risk Mapping – Pluvial & Groundwater - Sheet 1 of 2

Figure 3.5.4

2006 GCOB Route Option with Flood Risk Mapping – Pluvial & Groundwater - Sheet 2 of 2

Figure 3.5.5

2006 GCOB Route Option with Flood Risk Mapping – Fluvial & Coastal - Sheet 1 of 2

Figure 3.5.6

2006 GCOB Route Option with Flood Risk Mapping – Fluvial & Coastal - Sheet 2 of 2

Figure 3.6.1

2006 GCOB Route Options with Landscape and Visual Assessment - Sheet 1 of 2

Figure 3.6.2

2006 GCOB Route Options with Landscape and Visual Assessment - Sheet 2 of 2

Figure 3.7.1 2006 GCOB Route Options with Archaeological, Architectural & Cultural Heritage - Sheet 1 of 4
Figure 3.7.2 2006 GCOB Route Options with Archaeological, Architectural & Cultural Heritage - Sheet 2 of 4
Figure 3.7.3 2006 GCOB Route Options with Archaeological, Architectural & Cultural Heritage - Sheet 3 of 4
Figure 3.7.4

2006 GCOB Route Options with Archaeological, Architectural & Cultural Heritage - Sheet 4 of 4

Figure 3.8.1

2006 GCOB Route Option with Material Assets – Agricultural Constraints - Sheet 1 of 2

Figure 3.8.2

2006 GCOB Route Option with Material Assets – Agricultural Constraints - Sheet 2 of 2

Figure 3.9.1

2006 GCOB Route Option with Material Assets Non-Agricultural Impacts - Sheet 1 of 2

Figure 3.9.2

2006 GCOB Route Option with Material Assets Non-Agricultural Impacts - Sheet 2 of 2

Figure 3.9.3

2006 GCOB Route Options with Bord Gáis, HV ESB, SSE Constraints - Sheet 1 of 2

Figure 3.9.4

2006 GCOB Route Options with Bord Gáis, HV ESB, SSE Constraints - Sheet 2 of 2

Figure 3.10.1

2006 GCOB Route Option with Air & Climate Assessment - Sheet 1 of 2

Figure 3.10.2

2006 GCOB Route Option with Air & Climate Assessment - Sheet 2 of 2

Figure 3.11.1 2006 GCOB Route Option with Noise Constraints - Sheet 1 of 2
Figure 3.11.2 2006 GCOB Route Option with Noise Constraints - Sheet 2 of 2
Figure 3.12.1

2006 GCOB Route Option with Human Being Constraints - Sheet 1 of 2

Figure 3.12.2 2006 GCOB Route Option with Human Being Constraints - Sheet 2 of 2

 

 

 ** Appendix 5.5

Figure 1.1 Cyan Route Option Plan Layout
Figure 3.2.1 Cyan Route Option with Ecology Constraints - Habitats - Sheet 1 of 2
Figure 3.2.2 Cyan Route Option with Ecology Constraints - Habitats - Sheet 2 of 2
Figure 3.2.3

Cyan Route Option and Bat Survey Results - Sheet 1 of 2

Figure 3.2.4 Cyan Route Option and Bat Survey Results - Sheet 2 of 2
Figure 3.2.5

Cyan Route Option with Protected Flora and Fauna Species - Other Species - Sheet 1 of 2

Figure 3.2.6

Cyan Route Option with Protected Flora and Fauna Species - Other Species - Sheet 2 of 2

Figure 3.2.7 Cyan Route Option with Annex I Habitats at Lough Corrib cSAC Crossing
Figure 3.3.1 Cyan Route Option with Soils and Geology Unique Constraints - Sheet 1 of 2
Figure 3.3.2

Cyan Route Option Soils and Geology Unique Constraints - Sheet 2 of 2

Figure 3.3.3 Cyan Route Option with Solid Geology - Sheet 1 of 2
Figure 3.3.4 Cyan Route Option with Solid Geology - Sheet 2 of 2
Figure 3.3.5 Cyan Route Option with Soil Mapping - Sheet 1 of 2
Figure 3.3.6 Cyan Route Option with Soil Mapping - Sheet 2 of 2
Figure 3.3.7 Cyan Route Option with Subsoil Mapping - Sheet 1 of 2
Figure 3.3.8 Cyan Route Option with Subsoil Mapping - Sheet 2 of 2
Figure 3.3.9 Cyan Route Option with Soft Compressible Ground - Sheet 1 of 2
Figure 3.3.10 Cyan Route Option with Soft Compressible Ground - Sheet 2 of 2
Figure 3.3.11

Cyan Route Option with Principal Cuttings & Embankments - Sheet 1 of 2

Figure 3.3.12

Cyan Route Option with Principal Cuttings & Embankments - Sheet 2 of 2

Figure 3.4.1 Cyan Route Option with Hydrogeology Constraints - Sheet 1 of 2
Figure 3.4.2

Cyan Route Option with Hydrogeology Constraints - Sheet 2 of 2

Figure 3.5.1

Cyan Route Option with Hydrology Constraints – Drainage Catchments - Sheet 1 of 2

Figure 3.5.2

Cyan Route Option with Hydrology Constraints – Drainage Catchments - Sheet 2 of 2

Figure 3.5.3

Cyan Route Option with Flood Risk Mapping – Pluvial & Groundwater - Sheet 1 of 2

Figure 3.5.4

Cyan Route Option with Flood Risk Mapping – Pluvial & Groundwater Sheet 2 of 2

Figure 3.5.5

Cyan Route Option with Flood Risk Mapping – Fluvial & Coastal - Sheet 1 of 2

Figure 3.5.6 Cyan Route Option with Flood Risk Mapping – Fluvial & Coastal - Sheet 2 of 2
Figure 3.6.1 Cyan Route Options with Landscape and Visual Assessment - Sheet 1 of 2
Figure 3.6.2 Cyan Route Option with Landscape and Visual Assessment - Sheet 2 of 2
Figure 3.7.1

Cyan Route Option with Archaeological, Architectural & Cultural Heritage - Sheet 1 of 4

Figure 3.7.2

Cyan Route Option with Archaeological, Architectural & Cultural Heritage - Sheet 2 of 4

Figure 3.7.3

Cyan Route Option with Archaeological, Architectural & Cultural Heritage - Sheet 3 of 4

Figure 3.7.4

Cyan Route Option with Archaeological, Architectural & Cultural Heritage - Sheet 4 of 4

Figure 3.8.1

Cyan Route Option with Material Assets – Agricultural Constraints - Sheet 1 of 2

Figure 3.8.2

Cyan Route Option with Material Assets – Agricultural Constraints - Sheet 2 of 2

Figure 3.9.1

Cyan Route Option with Material Assets Non-Agricultural Impacts - Sheet 1 of 2

Figure 3.9.2

Cyan Route Option with Material Assets Non-Agricultural Impacts - Sheet 2 of 2

Figure 3.9.3 Cyan Route Options with Bord Gáis, HV ESB, SSE Constraints - Sheet 1 of 2
Figure 3.9.4 Cyan Route Options with Bord Gáis, HV ESB, SSE Constraints - Sheet 2 of 2
Figure 3.10.1 Cyan Route Options with Air & Climate Assessment - Sheet 1 of 2
Figure 3.10.2 Cyan Route Options with Air & Climate Assessment - Sheet 2 of 2
Figure 3.11.1 Cyan Route Option with Noise Constraints - Sheet 1 of 2
Figure 3.11.2 Cyan Route Option with Noise Constraints - Sheet 2 of 2
Figure 3.12.1 Cyan Route Option with Human Being Constraints - Sheet 1 of 2
Figure 3.12.2 Cyan Route Option with Human Being Constraints - Sheet 2 of 2

 

 

Volume 3D

Volume 3D - Appendix Part 4 Table of Contents Table of Contents
A.7.1 * Green2-Blue2 Switch Route Option Report
A.7.2 Cost Benefit Analysis Report
A.7.3 Road Safety Audit Stage F Report (Part 1)
A.7.4 **

European Sites Route Selection Assessment

A.7.5 Recorded Archaeological and Architectural Heritage Sites
A.8.1 Public Consultation No. 3
A.8.2 Road Safety Audit Stage F Report (Part 2)

 

 

 * Appendix 7.1

Figure 1.1 Green2 – Blue2 Switch Plan Layout
Figure 3.2.1 Green2 – Blue2 Switch Option with Ecology Constraints Habitats - Sheet 1 of 2
Figure 3.2.2 Green2 – Blue2 Switch Option with Ecology Constraints Habitats - Sheet 2 of 2
Figure 3.2.3 Green2 – Blue2 Switch Option with Bat Survey Results - Sheet 1 of 2
Figure 3.2.4 Green2 – Blue2 Switch Option with Bat Survey Results - Sheet 2 of 2
Figure 3.2.5

Green2 – Blue2 Switch Option with Protected Flora & Fauna Species - Sheet 1 of 2

Figure 3.2.6

Green2 – Blue2 Switch Option with Protected Flora & Fauna Species - Sheet 2 of 2

Figure 3.2.7

Green2 – Blue2 Switch Option with Annex I Habitats at Lough Corrib cSAC Crossings

Figure 3.3.1

Green2 – Blue2 Switch Option with Soils & Geology Unique Constraints - Sheet 1 of 2

Figure 3.3.2

Green2 – Blue2 Switch Option with Soils & Geology Unique Constraints - Sheet 2 of 2

Figure 3.3.3 Green2 – Blue2 Switch Option with Solid Geology - Sheet 1 of 2
Figure 3.3.4 Green2 – Blue2 Switch Option with Solid Geology - Sheet 2 of 2
Figure 3.3.5

Green2 – Blue2 Switch Option with Soil Mapping - Sheet 1 of 2

Figure 3.3.6 Green2 – Blue2 Switch Option with Soil Mapping - Sheet 2 of 2
Figure 3.3.7

Green2 – Blue2 Switch Option with Subsoil Mapping - Sheet 1 of 2

Figure 3.3.8 Green2 – Blue2 Switch Option with Subsoil Mapping - Sheet 2 of 2
Figure 3.3.9 Green2 – Blue2 Switch Option with Soft Compressible Ground - Sheet 1 of 2
Figure 3.3.10

Green2 – Blue2 Switch Option with Soft Compressible Ground - Sheet 2 of 2

Figure 3.3.11

Green2 – Blue2 Switch Option with Principal Cuttings & Embankments – Sheet 1 of 2

Figure 3.3.12

Green2 – Blue2 Switch Option with Principal Cuttings & Embankments – Sheet 2 of 2

Figure 3.4.1 Green2 – Blue2 Switch Option with Hydrogeology Constraints - Sheet 1 of 2
Figure 3.4.2 Green2 – Blue2 Switch Option with Hydrogeology Constraints - Sheet 2 of 2
Figure 3.5.1 Green2 – Blue2 Switch Option with Hydrology Constraints – Drainage Catchments - Sheet 1 of 2
Figure 3.5.2

Green2 – Blue2 Switch Option with Hydrology Constraints – Drainage Catchments - Sheet 2 of 2

Figure 3.5.3 Green2 – Blue2 Switch Option with Flood Risk Mapping – Pluvial & Groundwater - Sheet 1 of 2
Figure 3.5.4 Green2 – Blue2 Switch Option with Flood Risk Mapping – Pluvial & Groundwater - Sheet 2 of 2
Figure 3.5.5

Green2 – Blue2 Switch Option with Flood Risk Mapping – Fluvial & Coast - Sheet 1 of 2

Figure 3.5.6

Green2 – Blue2 Switch Option with Flood Risk Mapping – Fluvial & Coast - Sheet 2 of 2

Figure 3.6.1

Green2 – Blue2 Switch Option with Landscape and Visual Constraints - Sheet 1 of 2

Figure 3.6.2

Green2 – Blue2 Switch Option with Landscape and Visual Constraints - Sheet 2 of 2

Figure 3.7.1 Green 2 – Blue 2 Switch with Archaeological, Architectural & Cultural Heritage - Sheet 1 of 4
Figure 3.7.2 Green 2 – Blue2 Switch with Archaeological, Architectural & Cultural Heritage - Sheet 2 of 4
Figure 3.7.3 Green 2 – Blue2 Switch with Archaeological, Architectural & Cultural Heritage - Sheet 3 of 4
Figure 3.7.4

Green 2 – Blue2 Switch with Archaeological, Architectural & Cultural Heritage - Sheet 4 of 4

Figure 3.8.1

Green2 – Blue2 Switch Option with Material Assets Agricultural Constraints - Sheet 1 of 2

Figure 3.8.2

Green2 – Blue2 Switch Option with Material Assets Agricultural Constraints - Sheet 2 of 2

Figure 3.9.1

Green2 – Blue2 Switch Option with Material Assets Non-Agricultural Impacts - Sheet 1 of 2

Figure 3.9.2

Green2 – Blue2 Switch Option with Material Assets Non-Agricultural Impacts - Sheet 2 of 2

Figure 3.9.3

Green2 – Blue2 Switch Option with Bord Gáis, HV ESB, SSE Constraints - Sheet 1 of 2

Figure 3.9.4 Green2 – Blue2 Switch Option with Bord Gáis, HV ESB, SSE Constraints - Sheet 2 of 2
Figure 3.10.1 Green2 – Blue2 Switch Option with Air & Climate Assessment - Sheet 1 of 2
Figure 3.10.2 Green2 – Blue2 Switch Option with Air & Climate Assessment - Sheet 2 of 2
Figure 3.11.1 Green2 – Blue2 Switch Option with Noise Constraints - Sheet 1 of 2
Figure 3.11.2

Green2 – Blue2 Switch Option with Noise Constraints - Sheet 2 of 2

Figure 3.12.1

Green2 – Blue2 Switch Option with Human Being Constraints - Sheet 1 of 2

Figure 3.12.2 Green2 – Blue2 Switch Option with Human Being Constraints - Sheet 2 of 2

 

 

** Appendix 7.4

7.1 Article 6 Assessment Project Appraisal Shading Analysis Green2 Route Option (Sunlight Hours) - Sheet 1 of 2
7.2 Article 6 Assessment Project Appraisal Shading Analysis Blue2 Route Option (Sunlight Hours) - Sheet 2 of 2